SK-Trade Projects (EN)

Multimodal Transport of Industrial Equipment from Tolyatti to South Korea

Organize the international transport of industrial equipment from Tolyatti to South Korea via a European port, coordinating the overland and sea legs. The project required comprehensive organization of the shipment, including preparation of the equipment, packing, loading, delivery to the port, port handling and subsequent dispatch by sea.
Particular attention had to be paid to the safe preparation and stowage of the equipment at every stage of transport.