Unloading of the coal line from the vessel "St. George the Victorious".
In September 2022, a complex of works was carried out to unload the coal line from the vessel "St. George the Victorious" in the port of Taman. The weight of the parts ranged from 30 tons to 80 tons. Lifting of all loads was carried out synchronously by two cranes.
All works were completed on time.